Project: Extension in Derby

The Builder on this site was struggling due to his really awkward access, the builder could not get any lorry within 70m of the property due to a tight driveway situation!!, after carrying out the 70m pump for the 6m3 foundations the builder then had us back to pump the sub-floor, and was so happy with our service had us back a 3rd time to carry out all the floor prep and liquid floor screed too.